Jesse Gould (@jesse_gould) 's Twitter Profile
Jesse Gould

@jesse_gould

|| Melbourne Architect ||

ID: 296817387

linkhttp://www.modusforma.com.au calendar_today11-05-2011 13:10:35

1,1K Tweet

100 Takipçi

403 Takip Edilen

Jesse Gould (@jesse_gould) 's Twitter Profile Photo

Congratulations to the whole team on being awarded commendations for both public architecture and Urban Design at this year's AIA Vic Awards. To everyone within ⁦Level Crossing Removal Project⁩ a great achievement! Was a privilege to be project architect on this! linkedin.com/posts/jesse-mo…

Philip Oldfield (@sustainabletall) 's Twitter Profile Photo

All those people saying "what do we do with all the waste PV panels".... Look at how much waste PV creates compared to coal ash nature.com/articles/s4156…

All those people saying "what do we do with all the waste PV panels".... 

Look at how much waste PV creates compared to coal ash

nature.com/articles/s4156…
Philip Oldfield (@sustainabletall) 's Twitter Profile Photo

Pretty damning… “Following the BBC's reporting, Dezeen asked all 23 architecture studios working on the project if they were concerned about the allegations of human rights abuses connected to Neom. None of the studios issued a statement in response” dezeen.com/2024/06/25/neo…

Anthony Albanese (@albomp) 's Twitter Profile Photo

The Torrens to Darlington Project – the final piece of the North South Corridor in Adelaide – will create 5500 jobs a year while it’s being built. And it will make travel safer, faster and easier for Australians.

The Torrens to Darlington Project – the final piece of the North South Corridor in Adelaide – will create 5500 jobs a year while it’s being built.

And it will make travel safer, faster and easier for Australians.
9News Adelaide (@9newsadel) 's Twitter Profile Photo

Final plans are coming together for the Torrens to Darlington project, with the premier optimistic the tunnels may be finished before the 2031 set completion date. The final section of the North-South Corridor will complete 78 kilometres of non-stop, traffic light-free motorway

Final plans are coming together for the Torrens to Darlington project, with the premier optimistic the tunnels may be finished before the 2031 set completion date.

The final section of the North-South Corridor will complete 78 kilometres of non-stop, traffic light-free motorway