Rifai🎯3 (@timetrading1618) 's Twitter Profile
Rifai🎯3

@timetrading1618

Tweets are just ideas, not signals

ID: 1683637315523190784

calendar_today25-07-2023 00:36:53

771 Tweet

241 Followers

3 Following

Rifai🎯3 (@timetrading1618) 's Twitter Profile Photo

$WLFI 1D chart Diagonal Wyckoff accumulation breakout (inside of a descending Triangle) will take it to the previous high eventually a very aggressive mark-up. #Worldlibertyfinance #WLFI taking entries at 0.14-0.15$

$WLFI 1D chart
Diagonal Wyckoff accumulation breakout (inside of a descending Triangle) will take it to the previous high eventually a very aggressive mark-up.

#Worldlibertyfinance
#WLFI taking  entries  at 0.14-0.15$
Rifai🎯3 (@timetrading1618) 's Twitter Profile Photo

$TAO A classical combination of Wyckoff Accumulation Phases and Elliott Waves structure. CMP 444$ #Tao #Stbl #Ai #coai #Myx #Avnt

$TAO 
A classical combination of Wyckoff Accumulation Phases and Elliott Waves structure.  

CMP 444$

#Tao #Stbl #Ai #coai #Myx #Avnt
Rifai🎯3 (@timetrading1618) 's Twitter Profile Photo

$BTC Wave C is going as planned. Market is going for the last liquidation before the biggest #ALTSEASON Be safe and ready ⬆ #BTC #Eth #Crypto

$BTC 
Wave C is going as planned. 

Market is going for the last liquidation before the biggest #ALTSEASON 

Be safe and ready ⬆ 

#BTC #Eth #Crypto
Rifai🎯3 (@timetrading1618) 's Twitter Profile Photo

$ZK Daily chart Wyckoff Accumulation has done🔥 Re- accumulation is going on the bottom of SOS, potentially lead to a solid Elliott waves structure Interested to long as soon as a confirmation comes in #ZK at 0.049 Send it ⬆️

$ZK Daily chart 
Wyckoff Accumulation has done🔥

Re- accumulation is going on the bottom of SOS, potentially lead to a solid Elliott waves structure 

Interested to long as soon as a confirmation comes in 

#ZK at 0.049 
Send it ⬆️
Rifai🎯3 (@timetrading1618) 's Twitter Profile Photo

$STBL 4h ✨Sign of Strength after Wyckoff Accumulation ✅ ✨ Triangle Breakout, taken a mature retest✅ ✨Uppish Volumes ✅ ✨Perfect R:R #STBL 🔥 at 0.083 ish

$STBL 4h 
✨Sign of Strength after  Wyckoff Accumulation ✅

✨ Triangle Breakout, taken a mature retest✅

✨Uppish Volumes  ✅

✨Perfect R:R 

#STBL 🔥 at 0.083 ish
Rifai🎯3 (@timetrading1618) 's Twitter Profile Photo

$BTC Daily Found a local bottom, is ready for a small bounce (20th November- 28th November) before final down wave. Lets trade alts, many #ALts will bounce big during this time $BTC #Bitcoin #Eth $XRp #XPL #xdc $Stbl $Avnt $Myx

$BTC Daily

Found a local bottom, is ready for a small bounce (20th November- 28th November) before final down wave. 

Lets trade alts,  many #ALts will bounce big during this time

$BTC #Bitcoin #Eth $XRp #XPL #xdc $Stbl $Avnt $Myx