Bridge design for vessel collision. A🧵 The main span of the Francois Scott Key Bridge is 1300 ft. It also has 185 ft of clearance, making this a massive bridge. This type of bridge is considered complex. Baltimore is in for a long haul before replacement. Here is why. 1/x

Bridge design for vessel collision.  A🧵

The main span of the Francois Scott Key Bridge is 1300 ft. It also has 185 ft of clearance, making this a massive bridge. 

This type of bridge is considered complex.

Baltimore is in for a long haul before replacement. Here is why.

1/x