Prof. Jose-Luis Jimenez (@jljcolorado) 's Twitter Profile
Prof. Jose-Luis Jimenez

@jljcolorado

Dist. Prof. Univ. Colorado. #HighlyCited2023, Fellow AAAR & AGU. Bit.ly/TenSR Bit.ly/ATRVs Aerosols, pollution #EndFossilFuels #COVIDisAirborne

ID: 56768709

linkhttps://www.colorado.edu/chemistry/jose-luis-jimenez calendar_today14-07-2009 18:14:10

30,30K Tweet

96,96K Takipçi

573 Takip Edilen

Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

Good climate news this week 1 Global EV sales hit 3rd consecutive record high, up 32% year-on-year 2 International Court of Justice concludes historic 2-week hearings on what legal responsibilities States have to fight climate change; decision expected by September 3 China

Al Haddrell (@ukhadds) 's Twitter Profile Photo

Aerosol can stay in the air for days. So, why then does it readily deposit in your lungs? In my latest explainer video I discuss how/where aerosol deposits in the lungs, and how a misunderstanding of this process has led to confusion around masks. youtu.be/qbIuqv8iECc

AukeHoekstra (@aukehoekstra) 's Twitter Profile Photo

Truly great presentation by RMI showing (among others): Cleantech growth (e.g. solar, batteries and EVs) reliably predicted using normalized s-curves. And no hint of stopping. China leads everywhere. Maybe the west should get its act together. rmi.org/wp-content/upl…

Truly great presentation by <a href="/RockyMtnInst/">RMI</a> showing (among others):

Cleantech growth (e.g. solar, batteries and EVs) reliably predicted using normalized s-curves. And no hint of stopping.

China leads everywhere. Maybe the west should get its act together.
rmi.org/wp-content/upl…
Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

It took 30 years for Poland’s share of electricity from coal to go from 96% in 1990 to 68% in 2020. But Poland will get to 0 coal by 2032 -and its 2nd largest utility just announced it’s exiting coal by 2030 Dumping fossil fuels slowly, then all at once bloomberg.com/news/articles/…

It took 30 years for Poland’s share of electricity from coal to go from 96% in 1990 to 68% in 2020. But Poland will get to 0 coal by 2032 -and its 2nd largest utility just announced it’s exiting coal by 2030

Dumping fossil fuels slowly, then all at once bloomberg.com/news/articles/…
Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

Turns out Shell has been selling cargoes of liquefied natural gas as “carbon neutral”, using carbon credits from projects which may have had no emissions-cutting activities at all That’s reason number umpteenth why I had a chapter in my book entitled “Never Buy Carbon Offsets

Turns out Shell has been selling cargoes of liquefied natural gas as “carbon neutral”, using carbon credits from projects which may have had no emissions-cutting activities at all

That’s reason number umpteenth why I had a chapter in my book entitled “Never Buy Carbon Offsets
Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

Amazing new paper shows how the 2022 jump in oil & gas prices delivered $916b extra to Big Oil - almost all captured by Big Oil's backers Society as a whole received almost zero benefit and was, on average, impoverished: inequality worsened across the board

Amazing new paper shows how the 2022 jump in oil &amp; gas prices delivered $916b extra to Big Oil - almost all captured by Big Oil's backers

Society as a whole received almost zero benefit and was, on average, impoverished: inequality worsened across the board
Al Haddrell (@ukhadds) 's Twitter Profile Photo

If you got a CO2 monitor for Christmas and are wondering what exactly the device is used for, I’ve put together a video to walk you through some ways you can use it improve your indoor air quality, and to lower your risk of catching airborne viruses (C19) youtu.be/WKgUZbB1Yao

Mark Z. Jacobson (@mzjacobson) 's Twitter Profile Photo

Hello everyone, California's fossil gas use for electricity dropped an entire 25% in one year due to the growth of renewables and batteries. Dispels the myth that more renewables means more gas use. Gas is totally unnecessary.

Jon Ploug (@jonploug) 's Twitter Profile Photo

1/16 To those claiming "we learned nothing" from the pandemic: Our understanding of respiratory disease transmission has fundamentally transformed, revolutionizing public health approaches and challenging century-old paradigms.

Joseph Allen (@j_g_allen) 's Twitter Profile Photo

Can indoor air quality impact creative thinking? Our latest paper from the Global CogFx Study observed statistically strong and consistent evidence that higher concentrations of indoor CO2, as influenced by ventilation and occupancy, are associated with lower divergent creative

Can indoor air quality impact creative thinking? Our latest paper from the Global CogFx Study observed statistically strong and consistent evidence that higher concentrations of indoor CO2, as influenced by ventilation and occupancy, are associated with lower divergent creative
Peter Kalmus (@climatehuman) 's Twitter Profile Photo

Everyone needs to know that these fires were made possible by global heating, which is caused by the fossil fuel industry, which has lied and blocked action for half a century. And that this will all get much, much, much worse until we end the fossil fuel industry

Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

Climate change here, now: - Wildfires in California costliest fires anywhere, ever - Intense heatwave hit Australia - Asia typhoon season ravaged South East Asia, affecting millions - 2024 Earth's hottest year in recorded history - GHG concentrations surging WAKE UP WORLD

Climate change here, now:

- Wildfires in California costliest fires anywhere, ever
- Intense heatwave hit Australia
- Asia typhoon season ravaged South East Asia, affecting millions
- 2024 Earth's hottest year in recorded history
- GHG concentrations surging

WAKE UP WORLD
Al Haddrell (@ukhadds) 's Twitter Profile Photo

Latvia is running up the score! For context, Latvia’s GDP is about 1% of the UK’s. If they can do it, why not here? Why not everywhere?

Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

> 1 terawatts global installed solar capacity reached after 68 years > 2 terawatts reached just 2 years later = over half of our energy will come from solar alone by 2035 "The solar-driven shift to renewables is inevitable" reneweconomy.com.au/its-the-s-curv…

&gt; 1 terawatts global installed solar capacity reached after 68 years
&gt; 2 terawatts reached just 2 years later
= over half of our energy will come from solar alone by 2035

"The solar-driven shift to renewables is inevitable"

reneweconomy.com.au/its-the-s-curv…
Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

Good climate news this (and last) week 1 China reaches peak oil 2 Global electric vehicle sales up 25% in record 2024 3 US bans future oil & gas over 625m acres of waters 4 EU bank regulator tightens ESG rules 5 China’s first-ever energy law enters into force 6 EVs sold in UK

Kimberly Prather, Ph.D. (@kprather88) 's Twitter Profile Photo

A true shero led the largest filter build in history! Just saw her...she is still standing and on way to deliver over 400 air filters to LA!!!

Mark Z. Jacobson (@mzjacobson) 's Twitter Profile Photo

California just debunked a big myth about renewable energy “study finds we can keep the grid stable with more renewables-every major renewable-geothermal, hydro, wind, solar-is lower cost than fossil fuels on average, globally" grist.org/energy/califor… grist Matt Simon

Assaad Razzouk (@assaadrazzouk) 's Twitter Profile Photo

There is no "energy dominance" without renewables. Why would *anyone* not want to power the world with unlimited, free sun, wind and water, while cutting a fossil fuel addiction which requires at least 535 times more mining than renewables? (hint: see cartoon)

There is no "energy dominance" without renewables. Why would *anyone* not want to power the world with unlimited, free sun, wind and water, while cutting a fossil fuel addiction which requires at least 535 times more mining than renewables? (hint: see cartoon)
AMPA Cervantes IGE Bilbao 🌴🌴 (@ampacervantes_) 's Twitter Profile Photo

Presentación "Airearen kalitatea neurtzen eskola-inguruneetan - Midiendo la calidad del aire en entornos escolares". El viernes 23 de mayo 2025 en Cervantes (Bilbao) #NO2 Con Sagarrak Ekologista Taldea Ekologistak Martxan Atxuri Eskolako IGE/AMPA BIGE igecervantes.org/m23