Joseph Skonhovd (@joeyskonhovd) 's Twitter Profile
Joseph Skonhovd

@joeyskonhovd

engineer & dad

ID: 1268500230

calendar_today15-03-2013 01:54:09

407 Tweet

54 Followers

616 Following

Joseph Skonhovd (@joeyskonhovd) 's Twitter Profile Photo

Zane Hengsperger There is already alot of great talent in manufacturing. They work harder for less money. They are the top talent. Software engineering is overstaffed and inefficient.

Andrew McCalip (@andrewmccalip) 's Twitter Profile Photo

We have a existential manufacturing problem in America. Why aren't there Amazon/Tesla-scale gigafactory warehouses filled with CNC machines? Will we ever be able to make our own products again? How do we accelerate the turnaround of American manufacturing? I asked this question

shpetim (@shpetim) 's Twitter Profile Photo

We will protect our CAD Men. Silicon Valley thinks hard-earned skill can be replaced with a GPT wrapper and a monthly fee. But CAD isn’t just geometry—it’s grit. It’s forged through late nights, crashes, and fixing that one constraint. CAD Men are craftsmen—builders in the

We will protect our CAD Men.

Silicon Valley thinks hard-earned skill can be replaced with a GPT wrapper and a monthly fee. But CAD isn’t just geometry—it’s grit. It’s forged through late nights, crashes, and fixing that one constraint.

CAD Men are craftsmen—builders in the
mattparlmer 🪐 🌷 (@mattparlmer) 's Twitter Profile Photo

Industrial automation is >10x overpriced The only way to make industrial automation ubiquitous is to make it affordable And the only way to make it affordable is vertically integrated production of industrial robots

Joseph Skonhovd (@joeyskonhovd) 's Twitter Profile Photo

Popular platforms come at a high cost, but more affordable alternatives exist. However, these options remain niche players for now. I believe I understand why—does anyone else have insights?

Blake Scholl 🛫 (@bscholl) 's Twitter Profile Photo

This morning, I was on the road with the Symphony engine team, shopping for scalable industrial capacity to build jet engine parts. "Getting that part will take 18 months best case," we were told. Why?? The answer was a stunning revelation about the non-obvious ways China has

Craig Lawrence (@clawrence) 's Twitter Profile Photo

Worth repeating - MISO and Entergy have virtually no renewables in this region. Can we finally admit that not every outage is the fault of renewables? In fact - the vast majority of outages are not.