Steel Piling Solutions (@_steelpiling) 's Twitter Profile
Steel Piling Solutions

@_steelpiling

ID: 1272453960994115590

linkhttp://www.steelpilingsolutions.com calendar_today15-06-2020 09:00:47

16 Tweet

56 Followers

450 Following

Steel Piling Solutions (@_steelpiling) 's Twitter Profile Photo

Installing the new retaining wall at Victoria Pier for BAM Construction, as part of the flood defence projects for the Environmental Agency

Installing the new retaining wall at Victoria Pier for BAM Construction, as part of the flood defence projects for the Environmental Agency
Steel Piling Solutions (@_steelpiling) 's Twitter Profile Photo

Three degree raking front wall transition, with vertical wall return. With BAM Nuttall at Victoria Pier, for the Flood Alleviation Scheme. Let's make sure the people in Hull have dry feet this winter.

Three degree raking front wall transition, with vertical wall return. With BAM Nuttall at Victoria Pier, for the Flood Alleviation Scheme.

Let's make sure the people in Hull have dry feet this winter.
Steel Piling Solutions (@_steelpiling) 's Twitter Profile Photo

Last return wall piles going in behind the warehouse with Giken Pike Press. At Victoria Pier in Hull, with BAM Nuttall. Working on the Flood Alleviation Scheme.

Last return wall piles going in behind the warehouse with Giken Pike Press. At Victoria Pier in Hull, with BAM Nuttall. Working on the Flood Alleviation Scheme.