Kanishka Bokephode (@kanishkabokeph2) 's Twitter Profile
Kanishka Bokephode

@kanishkabokeph2

BTech in Railway Engineering, BTech in Mechanical Engineering, MITCORER, Tech. Electronics, Member IRFCA

ID: 1545996284229992450

calendar_today10-07-2022 05:00:22

5,5K Tweet

77 Followers

202 Following

Abhishek Murarka 💹🐂 (@abhymurarka) 's Twitter Profile Photo

6/ Have expanded list to 120+ market leaders, which makes it the most exhaustive list of its kind. Also all market related metrics are updated as of yesterday. Sharing details for Part 4 below (alphabetic order):

6/ Have expanded list to 120+ market leaders, which makes it the most exhaustive list of its kind. Also all market related metrics are updated as of yesterday.

Sharing details for Part 4 below (alphabetic order):
Murlidhar Mohol (@mohol_murlidhar) 's Twitter Profile Photo

In public interest, the Ministry of Civil Aviation has issued fare caps to prevent unreasonable surge pricing caused by recent disruptions. We are committed to protecting passengers and ensuring stable, affordable air travel. Narendra Modi PMO India Ram Mohan Naidu Kinjarapu MoCA_GoI

In public interest, the Ministry of Civil Aviation has issued fare caps to prevent unreasonable surge pricing caused by recent disruptions.

We are committed to protecting passengers and ensuring stable, affordable air travel.

<a href="/narendramodi/">Narendra Modi</a> 
<a href="/PMOIndia/">PMO India</a> 
<a href="/RamMNK/">Ram Mohan Naidu Kinjarapu</a> 
<a href="/MoCA_GoI/">MoCA_GoI</a>
Siege (@siege4570) 's Twitter Profile Photo

Mumbai-Amdavad Bullet Train Signalling Update 🚄🇮🇳 Bharat’s Bullet Train corridor is now moving with dual pathways for faster commissioning: 🔹 ETCS Level-2 Contract for the S1 package awarded to DRA Infra + Siemens. This will power Indigenous Rolling Stock & early operations.

Mumbai-Amdavad Bullet Train Signalling Update 🚄🇮🇳

Bharat’s Bullet Train corridor is now moving with dual pathways for faster commissioning:

🔹 ETCS Level-2 
Contract for the S1 package awarded to DRA Infra + Siemens.
This will power Indigenous Rolling Stock &amp; early operations.
The Data of Everything (@thedatahubx) 's Twitter Profile Photo

World’s Best-Selling Motorcycles 1. 🇮🇳 Hero Splendor Plus → 3.31 Million 2. 🇯🇵 Honda Activa 110/125 → 2.39 M 3. 🇯🇵 Honda CB Shine 100/125 → 1.75 M 4. 🇯🇵 Honda BeAT 110 → 1.63 M 5. 🇮🇳 Bajaj Pulsar → 1.42 M 6. 🇮🇳 TVS Jupiter 110/125 → 0.86 M 7. 🇮🇳 Hero HF Deluxe → 0.85 M

World’s Best-Selling Motorcycles

1. 🇮🇳 Hero Splendor Plus → 3.31 Million 
2. 🇯🇵 Honda Activa 110/125 → 2.39 M
3. 🇯🇵 Honda CB Shine 100/125 → 1.75 M
4. 🇯🇵 Honda BeAT 110 → 1.63 M
5. 🇮🇳 Bajaj Pulsar → 1.42 M
6. 🇮🇳 TVS Jupiter 110/125 → 0.86 M
7. 🇮🇳 Hero HF Deluxe → 0.85 M
Trains of India (@trainwalebhaiya) 's Twitter Profile Photo

One organisation that is truly raising the bar in rail transportation in India is National Capital Region Transport Corporation Ltd. (RRTS) It has recently inducted a high-speed, indigenously built Catenary Maintenance Vehicle for the 82-km Delhi–Ghaziabad–Meerut corridor which is designed for speeds up to 120

One organisation that is truly raising the bar in rail transportation in India is <a href="/officialncrtc/">National Capital Region Transport Corporation Ltd.</a> (RRTS)

It has recently inducted a high-speed, indigenously built Catenary Maintenance Vehicle for the 82-km Delhi–Ghaziabad–Meerut corridor which is designed for speeds up to 120
DRM Bhusaval (@bhusavaldivn) 's Twitter Profile Photo

Down line traffic in the Bhusawal–Badnera section has been affected due to an operational issue at Malkapur Yard. Restoration work is underway on priority. Passengers may contact the following Help Desks for assistance: -Akola Help Desk: 9960711985 -Shegaon Help Desk:

Satyajeet Tambe (@satyajeettambe) 's Twitter Profile Photo

🚆 Pune-Nashik Semi HighSpeed Railway ! 🧵 Let’s be clear: the decision to divert the Pune–Nashik Semi High-Speed Rail from its original, approved route is not just a “technical change.” It has significant implications for the people of this region affecting years of planning,

🚆 Pune-Nashik Semi HighSpeed Railway ! 🧵 

Let’s be clear: the decision to divert the Pune–Nashik Semi High-Speed Rail from its original, approved route is not just a “technical change.”

It has significant implications for the people of this region affecting years of planning,
Rahul Kulkarni (@rahulasks) 's Twitter Profile Photo

ब्रेकिंग न्यूज लातूर–मुंबई नवीन रस्त्याचा आराखडा तयार लवकरच लातूरहून मुंबई फक्त पाच तासांत गाठणे शक्य होणार. 👉 पाच हजार कोटी रुपयांचा आराखडा तयार 👉 लातूरहून नवीन मार्ग माळशेज घाटातून जाणार 👉 ही माहिती मुख्यमंत्री देवेंद्र फडणवीस यांनी दिली

The Maharashtra Index (@themahaindex) 's Twitter Profile Photo

The biggest technical roadblock in launching a direct Nashik–Mumbai local is finally getting cleared! The Railway Board has officially approved 2-new 131 km railway lines between Manmad–Kasara, including a mega plan of 18 tunnels across the Sahyadris. 🌄🚇 👍 L.A notification

The biggest technical roadblock in launching a direct Nashik–Mumbai local is finally getting cleared! 

The Railway Board has officially approved 2-new 131 km railway lines between Manmad–Kasara, including a mega plan of 18 tunnels across the Sahyadris. 🌄🚇

👍 L.A notification
The Maharashtra Index (@themahaindex) 's Twitter Profile Photo

The Kalyan Latur Expressway gets green Signal from the Maharashtra Government. Travel from Kalyan/Thane to Latur in just 5-7 hours instead of 10–11. Project Cost: ₹35,000 Cr (Estimated) The project has received in-principle approval from CM Devendra Fadnavis. 🔷 In Brief:

The Kalyan Latur Expressway gets green Signal from the Maharashtra Government. 

Travel from Kalyan/Thane to Latur in just 5-7 hours instead of 10–11.

Project Cost: ₹35,000 Cr (Estimated)

The project has received in-principle approval from CM Devendra Fadnavis. 

🔷 In Brief:
Infra News India (INI) (@theiniofficial) 's Twitter Profile Photo

🛣️𝐌𝐚𝐡𝐚𝐫𝐚𝐬𝐡𝐭𝐫𝐚 𝐄𝐱𝐩𝐫𝐞𝐬𝐬𝐰𝐚𝐲 𝐍𝐞𝐭𝐰𝐨𝐫𝐤🛣️ With the Kalyan-Latur Expressway moving to the DPR preparation stage, only 2 expressways from the ambitious Maharashtra Expressway Grid project now remain in the 'proposed' stage. All other expressways are in

🛣️𝐌𝐚𝐡𝐚𝐫𝐚𝐬𝐡𝐭𝐫𝐚 𝐄𝐱𝐩𝐫𝐞𝐬𝐬𝐰𝐚𝐲 𝐍𝐞𝐭𝐰𝐨𝐫𝐤🛣️ 

With the Kalyan-Latur Expressway moving to the DPR preparation stage, only 2 expressways from the ambitious Maharashtra Expressway Grid project now remain in the 'proposed' stage.

All other expressways are in
SANJAY BAFNA (@sanjaybafna) 's Twitter Profile Photo

#BREAKING Reliance Jio Happy New Year 2026 Plans ✨🚨 - Total 3 Plans : 1.Hero Annual Recharge ₹3599 •Unlimited 5G, 2.5 GB/day, Unlimited Voice and 100 SMS/day •Validity: 365 days •Special offer: Free 18-month Pro Plan of Google Gemini worth ₹35,100 2.Super Celebration

#BREAKING 
Reliance Jio Happy New Year 2026 Plans ✨🚨 - Total 3 Plans : 

1.Hero Annual Recharge ₹3599
•Unlimited 5G, 2.5 GB/day, Unlimited Voice and 100 SMS/day
•Validity: 365 days
•Special offer: Free 18-month Pro Plan of Google Gemini worth ₹35,100

2.Super Celebration