Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile
Wealth of Nations. Alpha-test stage

@wonnft

The first real economic browser play-to-earn strategy game built on @solana. magiceden.io/marketplace/we… discord.gg/trT66n2mhb

ID: 1408394004950048769

linkhttps://won.onl calendar_today25-06-2021 12:03:56

590 Tweet

2,2K Followers

133 Following

Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍🎮 Wealth of Nations Game: Ancient Nabatean Tribe 🏛Historical background: The Nabateans were an ancient tribe that inhabited the territory of modern Jordan. They were known for their skills in trade and architecture, as evidenced by numerous surviving monuments, including the

🌍🎮 Wealth of Nations Game: Ancient Nabatean Tribe

🏛Historical background: The Nabateans were an ancient tribe that inhabited the territory of modern Jordan. They were known for their skills in trade and architecture, as evidenced by numerous surviving monuments, including the
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

⚔️ Gaming tribe Ligurians in Wealth of Nations ⚔️ 📜 Historically, the Ligurians were an ancient people who inhabited the territory of modern Italy. Their presence on this land dates back to ancient times and continued until the zero years. 🌍 Regions of Residence: - Liguria

⚔️ Gaming tribe Ligurians in Wealth of Nations ⚔️

📜 Historically, the Ligurians were an ancient people who inhabited the territory of modern Italy. Their presence on this land dates back to ancient times and continued until the zero years.

🌍 Regions of Residence:
- Liguria
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🏛️ Tribe Aedui in the game Wealth of Nations 🌍 Aedui, or Edui - is a historical tribe, actively present in the game "Wealth of Nations". The Aedui were one of the most powerful tribes in Gaul, with great influence from the beginning of times until 850 AD. 🌿 Regions and

🏛️ Tribe Aedui in the game Wealth of Nations 🌍

Aedui, or Edui - is a historical tribe, actively present in the game "Wealth of Nations". The Aedui were one of the most powerful tribes in Gaul, with great influence from the beginning of times until 850 AD.

🌿 Regions and
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍History of the San Tribe in Wealth of Nations🌍 The San tribe, also known as Bushmen, have long inhabited the expanses of southern Africa. They are among the oldest peoples on our planet, their history spans tens of thousands of years. 📍Living Regions📍 • Botswana (1000 BC

🌍History of the San Tribe in Wealth of Nations🌍

The San tribe, also known as Bushmen, have long inhabited the expanses of southern Africa. They are among the oldest peoples on our planet, their history spans tens of thousands of years.

📍Living Regions📍
• Botswana (1000 BC
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🕹️ Wealth of Nations: The Marcomanni Tribe🌍 The Marcomanni were a significant Germanic tribe that played a key role in European history during the Roman Empire era. They were known for their military successes and resistance against Rome. 📍Habitat regions and historical

🕹️ Wealth of Nations: The Marcomanni Tribe🌍

The Marcomanni were a significant Germanic tribe that played a key role in European history during the Roman Empire era. They were known for their military successes and resistance against Rome.

📍Habitat regions and historical
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌴The Tupi Tribe in the Wealth of Nations game 📜 Historical Background: The Tupi are a large group of indigenous tribes that lived in pre-Columbian times in the territory of modern Brazil. The Tupi were characterized by a highly developed culture and complex social structure.

🌴The Tupi Tribe in the Wealth of Nations game

📜 Historical Background: The Tupi are a large group of indigenous tribes that lived in pre-Columbian times in the territory of modern Brazil. The Tupi were characterized by a highly developed culture and complex social structure.
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

📜Wealth of Nations: Miskito Tribe🗿 The Miskito are an indigenous tribe that inhabited the territories of modern-day Nicaragua and Honduras. Known for their military skills, they were a significant player in the geopolitical struggle of Central America. 📍Regions and periods:

📜Wealth of Nations: Miskito Tribe🗿

The Miskito are an indigenous tribe that inhabited the territories of modern-day Nicaragua and Honduras. Known for their military skills, they were a significant player in the geopolitical struggle of Central America.

📍Regions and periods:
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍Wealth of Nations: Fulani Tribe🌍 📜The Fulani are one of the largest ethnic communities in West Africa. They are known for their nomadic lifestyle and livestock farming. Regions of residence🌍: Songhai: 1000 BC - to the end of time Western Sahara: 1000 BC - to the end of

🌍Wealth of Nations: Fulani Tribe🌍

📜The Fulani are one of the largest ethnic communities in West Africa. They are known for their nomadic lifestyle and livestock farming.

Regions of residence🌍:
Songhai: 1000 BC - to the end of time
Western Sahara: 1000 BC - to the end of
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🎮 Wealth of Nations: Xhosa Tribe 🎮 🌍 The majestic landscapes of South Africa have been home to the Xhosa tribe since 1000 BC and until the end of times in our game. Originally small clans, they evolved and grew, becoming a key player in the history of the region. 🏹 The

🎮 Wealth of Nations: Xhosa Tribe 🎮

🌍 The majestic landscapes of South Africa have been home to the Xhosa tribe since 1000 BC and until the end of times in our game. Originally small clans, they evolved and grew, becoming a key player in the history of the region.

🏹 The
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌏 Arakanese Tribe The Arakanese - a historical tribe whose representatives settled in Southeast Asia. Their history is woven into the cultural fabric of this region from ancient times to the present day. 📍 Regions of residence: - Southeast Asia (from the beginning of time to

🌏 Arakanese Tribe

The Arakanese - a historical tribe whose representatives settled in Southeast Asia. Their history is woven into the cultural fabric of this region from ancient times to the present day.

📍 Regions of residence:
- Southeast Asia (from the beginning of time to
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

Guarani Tribe from the game Wealth of Nations 🌎🎮 🔹Historical background: The Guarani tribe is one of the largest South American tribes, inhabiting the territories of modern Paraguay, Brazil, Uruguay, and Argentina. The Guarani are known for their unique traditions and

Guarani Tribe from the game Wealth of Nations 🌎🎮

🔹Historical background:
The Guarani tribe is one of the largest South American tribes, inhabiting the territories of modern Paraguay, Brazil, Uruguay, and Argentina. The Guarani are known for their unique traditions and
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🎮 Wealth of Nations: The Belgae Tribe 🌍 The Belgae tribe was one of the most powerful tribes in antiquity. They originally inhabited the region now known as Belgium. Historians claim that they were brave warriors and skilled traders. 🏞 Regions and periods of residence: -

🎮 Wealth of Nations: The Belgae Tribe 🌍

The Belgae tribe was one of the most powerful tribes in antiquity. They originally inhabited the region now known as Belgium. Historians claim that they were brave warriors and skilled traders.

🏞 Regions and periods of residence:
-
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🏛️Wealth of Nations: The Libyan Tribe🏛️ The Libyans are an ancient tribe that lived in the territories of modern Libya and Tunisia. The history of this tribe dates back to ancient times, they inhabited vast territories of North Africa and were among the first civilizations in

🏛️Wealth of Nations: The Libyan Tribe🏛️

The Libyans are an ancient tribe that lived in the territories of modern Libya and Tunisia. The history of this tribe dates back to ancient times, they inhabited vast territories of North Africa and were among the first civilizations in
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍 The Mandinka Tribe in Wealth of Nations 🌍 The Mandinka are an ancient tribe that plays a significant role in the history of Africa. They originate from West Africa and are known for their traditions and culture. 📍 Regions and Periods 📍 The Mandinka have been in the

🌍 The Mandinka Tribe in Wealth of Nations 🌍

The Mandinka are an ancient tribe that plays a significant role in the history of Africa. They originate from West Africa and are known for their traditions and culture.

📍 Regions and Periods 📍
The Mandinka have been in the
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍 Wealth of Nations: Lydians Game Tribe 🏛️ The Lydians are a great tribe, tracing their history back to ancient times. They are famous for their trading skills and political games. Their lands spread across Western Anatolia, where they stood from the very beginning of time

🌍 Wealth of Nations: Lydians Game Tribe 🏛️

The Lydians are a great tribe, tracing their history back to ancient times. They are famous for their trading skills and political games. Their lands spread across Western Anatolia, where they stood from the very beginning of time
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

Now you can log into your cabinet or game - using your crypto wallet Solana, TON, BASE (EVM) are available #ton #solana #base #crypto WoN.onl

Now you can log into your cabinet or game - using your crypto wallet

Solana, TON, BASE (EVM) are available
#ton #solana #base #crypto

WoN.onl
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍 Wealth of Nations: Chimu Tribe 🌍 Let's dive into the history of the Chimu tribe, a civilization that thrived in the territory of modern Peru before the arrival of the Incas. 📍 Regions of residence and periods: 1. Peru (1000 BC - end of times) 2. Middle Andes (1000 BC -

🌍 Wealth of Nations: Chimu Tribe 🌍

Let's dive into the history of the Chimu tribe, a civilization that thrived in the territory of modern Peru before the arrival of the Incas.

📍 Regions of residence and periods: 
1. Peru (1000 BC - end of times)
2. Middle Andes (1000 BC -
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

The Hvarts Tribe in the game Wealth of Nations 🌍 Hvarts is an ancient tribe that lived in the territory of the North Caucasus. The Hvarts were known for their warrior spirit and perseverance, which is reflected in their state structure and religious beliefs. Regions and

The Hvarts Tribe in the game Wealth of Nations 🌍

Hvarts is an ancient tribe that lived in the territory of the North Caucasus. The Hvarts were known for their warrior spirit and perseverance, which is reflected in their state structure and religious beliefs.

Regions and
Wealth of Nations. Alpha-test stage (@wonnft) 's Twitter Profile Photo

🌍 Bambara Tribe in the Game Wealth of Nations 🌍 The inhabitants of West Africa, the Bambara tribe, have become a symbol of unyielding resilience and the fight for their traditions. In ancient times, they lived in harmony with nature, and their religious views included animism.

🌍 Bambara Tribe in the Game Wealth of Nations 🌍

The inhabitants of West Africa, the Bambara tribe, have become a symbol of unyielding resilience and the fight for their traditions. In ancient times, they lived in harmony with nature, and their religious views included animism.