Timeast Offshore Engineering (@timeaste) 's Twitter Profile
Timeast Offshore Engineering

@timeaste

Timeast focuses on submarine/offshore engineering business from the foundation,

ID: 1241927409915420672

linkhttps://www.chinatimeast.com/ calendar_today23-03-2020 03:19:09

65 Tweet

6 Takipçi

5 Takip Edilen

Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009) 16km #submarine/#offshore #pipeline #post-trenching. #achievements #projects #solution #Hire us ! [email protected] chinatimeast.com/submarine-pipe…

Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009)
16km #submarine/#offshore #pipeline #post-trenching.
#achievements #projects #solution
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009) 16km #submarine/#offshore #pipeline #post-trenching. #achievements #projects #solution #Hire us ! [email protected] chinatimeast.com/submarine-pipe…

Jidong Oil Field1-3 Island Submarine/Offshore Pipeline Post-Trenching Project (Year 2009)
16km #submarine/#offshore #pipeline #post-trenching.
#achievements #projects #solution
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Weizhou Submarine/Offshore Pipeline Post-Trenching Project (Year 2008) 28km submarine/offshore pipeline post-trenching. #achievements #projects #solution #Hire us ! [email protected] chinatimeast.com/submarine-pipe…

Weizhou Submarine/Offshore Pipeline Post-Trenching Project (Year 2008)
28km submarine/offshore pipeline post-trenching.
#achievements #projects #solution
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

CNOOC BN Submarine/#Offshore Pipeline #Landing Project (Year 2005) Project Introduction: BN 26-2 submarine/offshore pipeline landing #project is part of CNOOC BN oil field development project. chinatimeast.com/submarine-pipe…

CNOOC BN Submarine/#Offshore Pipeline #Landing Project (Year 2005)
Project Introduction: BN 26-2 submarine/offshore pipeline landing #project is part of CNOOC BN oil field development project.
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

CNOOC Indonesia SES #Gas #Submarine/Offshore Pipeline Landing Project (Year 2005) Project Introduction: CNOOC Indonesia SES gas submarine/offshore #pipeline #landingproject. chinatimeast.com/submarine-pipe…

CNOOC Indonesia SES #Gas #Submarine/Offshore Pipeline Landing Project (Year 2005)
Project Introduction: CNOOC Indonesia SES gas submarine/offshore #pipeline #landingproject.
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

CNOOC Panyu #Submarine/Offshore Pipeline Landing Project (Year 2004) Project Introduction: Panyu submarine/offshore pipeline landing project is part of submarine pipeline of CNOOC Panyu oil field oil & gas development project. chinatimeast.com/submarine-pipe…

CNOOC Panyu #Submarine/Offshore Pipeline Landing Project (Year 2004)
Project Introduction: Panyu submarine/offshore pipeline landing project is part of submarine pipeline of CNOOC Panyu oil field oil & gas development project.
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

CNOOC LD #Submarine/Offshore Pipeline Laying Project (Year 2004) Project Introduction: LD submarine/#offshore #pipeline #laying project is part of CNOOC LD 5-2 oil field oil & gas development project. #Hire us ! [email protected] chinatimeast.com/submarine-pipe…

CNOOC LD #Submarine/Offshore Pipeline Laying Project (Year 2004)
Project Introduction: LD submarine/#offshore #pipeline #laying project is part of CNOOC LD 5-2 oil field oil & gas development project.
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

CNOOC DF 1-1 #Oil Field Submarine/Offshore Pipeline Landing Project (Year 2002) Work Scope: Steel pile #installation, pre-trenching, pipeline pulling and landing, #backfilling, site service, local authority relationships coordination. chinatimeast.com/submarine-pipe…

CNOOC DF 1-1 #Oil Field Submarine/Offshore Pipeline Landing Project (Year 2002)
Work Scope: Steel pile #installation, pre-trenching, pipeline pulling and landing, #backfilling, site service, local authority relationships coordination.
chinatimeast.com/submarine-pipe…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

JZ9-3 #OilFieldPlatform Anti-Icing Design, Fabrication and #Installation (Year 2009) Project Introduction: JZ9-3 #oil field Jacket anti-icing destroyed seriously. chinatimeast.com/offshore-platf…

JZ9-3 #OilFieldPlatform Anti-Icing Design, Fabrication and #Installation (Year 2009)
Project Introduction: JZ9-3 #oil field Jacket anti-icing destroyed seriously.
chinatimeast.com/offshore-platf…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Floating Hose #Inspection, #Displace, #Installation Timeast performed many CNOOC QHD32-6、CFD11-2 and JZ9-3 offshore oil field floating inspection and displacement #project. #Hire us ! [email protected] chinatimeast.com/offshore-platf…

Floating Hose #Inspection, #Displace, #Installation
Timeast performed many CNOOC QHD32-6、CFD11-2 and JZ9-3 offshore oil field floating inspection and displacement #project.
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/offshore-platf…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Project Introduction: -Jumper Hose Parameter: ø 24”×55m -Working Pressure: 139bar -Jumper Cable Parameter: ø149mm×55m #Hire us ! [email protected] chinatimeast.com/offshore-platf…

Project Introduction:
-Jumper Hose Parameter: ø 24”×55m
-Working Pressure: 139bar
-Jumper Cable Parameter: ø149mm×55m
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/offshore-platf…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Sinopec Hangzhou Bay #Submarine/#Offshore Pipeline Laying #Project (Year 2003) Project Introduction: This is #gas pipeline crossing Hangzhou Bay project,  Contractor is Hyundai Heavy Industries Co., Ltd. chinatimeast.com/submarine-oil-…

Sinopec Hangzhou Bay #Submarine/#Offshore Pipeline Laying #Project (Year 2003)
Project Introduction: This is #gas pipeline crossing Hangzhou Bay project,  Contractor is Hyundai Heavy Industries Co., Ltd.
chinatimeast.com/submarine-oil-…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

PetroChina Liaohe Oil Field Hainan-8 Submarine/Offshore Pipeline Laying Project (Year 2005) Work Scope: 7.5km long #subsea #pipeline floating #installation, pipeline landing, riser and spool installation, post-trenching, and hydrotesting.  chinatimeast.com/submarine-oil-…

PetroChina Liaohe Oil Field Hainan-8 Submarine/Offshore Pipeline Laying Project (Year 2005)
Work Scope: 7.5km long #subsea #pipeline floating #installation, pipeline landing, riser and spool installation, post-trenching, and hydrotesting. 
chinatimeast.com/submarine-oil-…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10) #Project Introduction: This project is #water supplying from land to #offshore island.  #Hire us ! [email protected] chinatimeast.com/submarine-poll…

Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year 2017.10)
#Project Introduction: This project is #water supplying from land to #offshore island.  
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/submarine-poll…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Hebei Province CFD Chemical #Industrial Area #Submarine/Offshore Pollution #Drainage #Pipeline Laying Project (Year 2017) Project Introduction: Onshore pipeline 0.2km, offshore pipeline 1.37km. #Hire us ! [email protected] chinatimeast.com/submarine-poll…

Hebei Province CFD Chemical #Industrial Area #Submarine/Offshore Pollution #Drainage #Pipeline Laying Project (Year 2017)
Project Introduction: Onshore pipeline 0.2km, offshore pipeline 1.37km.
#Hire us ! chenjj@timeast.com.cn
chinatimeast.com/submarine-poll…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016) Project Introduction: The designed #drainage quantity is 50,000 m3/d, #subsea #pipeline total length 9.4km (DN1000), wall thickness: 15.9mm. chinatimeast.com/submarine-poll…

Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
Project Introduction: The designed #drainage quantity is 50,000 m3/d, #subsea #pipeline total length 9.4km (DN1000), wall thickness: 15.9mm.
chinatimeast.com/submarine-poll…
Timeast Offshore Engineering (@timeaste) 's Twitter Profile Photo

Urgently!We need purchase the used tensioner, Large pipeline transportation tensioner for pipe laying system, specific models are as follows:50-100 T If you have the such equipment, please feel free to contact us, thank you! Email: [email protected]

Urgently!We need purchase the used tensioner, Large pipeline transportation tensioner for pipe laying system, specific models are as follows:50-100 T
If you have the such equipment, please feel free to contact us, thank you!
Email: chenjj@timeast.com.cn