Rajan Singh(@rsliveIndia) 's Twitter Profileg
Rajan Singh

@rsliveIndia

🏗️ Showcasing India's 🇮🇳 Infrastructural Marvels.¦¦
🚁 Drone Pilot ¦¦
😊 2.5 Lakh YouTube Subscribers ¦¦
📧 For Business [email protected]
Jai Hind 🇮🇳

ID:72573604

linkhttp://www.rslive.in calendar_today08-09-2009 15:01:55

3,1K Tweets

15,5K Followers

258 Following

Follow People
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

The 260-meter long Special Span being constructed for the - Regional Rapid Transit System ( ) corridor to cross over Delhi’s Barapullah flyover at 25 metres above the ground is nearing completion.

account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

The 260-meter long Special Span being constructed for the - Regional Rapid Transit System ( ) corridor to cross over Delhi’s Barapullah flyover at 25 metres above the ground is nearing completion.

National Capital Region Transport Corporation Ltd. Anurag Jain

account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

The speed with which work has been done on this international airport, even ISBT cannot be constructed at such a speed. This is International Airport where test runs of flights have started on the runway for landing and taking off. 🫡😍

account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

Thank you so much for your love and Support Everybody 🙏😊 today we reached 50k followers on Instagram.

Click on the link to follow.
instagram.com/rsliveindia?ig…

Thank you so much for your love and Support Everybody 🙏😊 today we reached 50k followers on Instagram. Click on the link to follow. instagram.com/rsliveindia?ig… #rslive
account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

Meerut Expressway or NE3 is India's widest 96 km long controlled-access expressway,connecting Delhi with Meerut via Dasna in   in . The 8 lanes old stretch of National Highway 9 (NH-9) up to Dasna is widened to 14 lanes (widest expressway in India). The

account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

is an approved 670 km (420 mi) long, 4-lane (expandable to 8 lanes) wide controlled-access expressway, which will connect Bahadurgarh border near Delhi with Katra in Jammu and Kashmir via and .

account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

Ganga Expressway is an under-construction, 594 km (369 mi) long, 6-lane (expandable to 8) wide greenfield in the state of  , .

It is being implemented by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) on

account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

National Capital Region Transport Corporation (NCRTC) has submitted the Detailed Project Report (DPR) for the Regional Rapid Transit System ( ) and Metro Line that will connect Noida International Airport (NIA) with rest of Delhi and with the National Capital Region

National Capital Region Transport Corporation (NCRTC) has submitted the Detailed Project Report (DPR) for the Regional Rapid Transit System (#RRTS) and Metro Line that will connect Noida International Airport (NIA) with rest of Delhi and with the National Capital Region
account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

The  Direct Flyway or  Flyway is India's first 8-lane wide, 7.5 km (4.7 mi) long access-controlled  in Delhi NCR.

The Toll Bridge Company Limited (NTBCL) owned by IL&FS, operate and maintains it on build-own-operate-transfer (BOOT) basis. The

The #Delhi #Noida Direct Flyway or #DND Flyway is India's first 8-lane wide, 7.5 km (4.7 mi) long access-controlled #expressway in Delhi NCR. The #Noida Toll Bridge Company Limited (NTBCL) owned by IL&FS, operate and maintains it on build-own-operate-transfer (BOOT) basis. The
account_circle
Rajan Singh(@rsliveIndia) 's Twitter Profile Photo

The Delhi Regional Rapid Transit System, also known as Delhi Meerut , –Ghaziabad–Meerut is an under-construction and partially operational 82.15 km long project.
RRTS is a new, dedicated, high speed, high capacity, comfortable commuter service connecting

account_circle