Mach85 Inc. (@mach85inc) 's Twitter Profile
Mach85 Inc.

@mach85inc

Mach85 Inc. is a trusted global provider of non-contact 3D measurements, computer simulations, impact testing & material characterization.

ID: 879509015952334848

linkhttp://www.mach85.com calendar_today27-06-2017 01:17:44

167 Tweet

122 Takipçi

507 Takip Edilen

Springboard Atlantic (@sbatlantic) 's Twitter Profile Photo

This lab does some serious high-speed impact testing to simulate things like hail, debris and bird strikes for all sorts of industries! Check out the size of these guns! #BAMlab UNB Research Mach85 Inc.

This lab does some serious high-speed impact testing to simulate things like hail, debris and bird strikes for all sorts of industries! 
Check out the size of these guns! #BAMlab <a href="/UNBResearch/">UNB Research</a> <a href="/Mach85Inc/">Mach85 Inc.</a>
Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

We're hiring! Please share our posting for a Lead Software Developer with any qualified candidates 👉 mach85.com/careers

Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Happy to welcome our newest students to Mach85 Inc. , (L-R) Luis Paredes (New Brunswick Community College), Alyssa Wilcox (UNB FCS), and Sharon MacLean (UNB Engineering). They are pictured here in front of a 2-Stage Light Gas Gun, which can shoot up to 8 km/s. Welcome to the team!

Happy to welcome our newest students to <a href="/Mach85Inc/">Mach85 Inc.</a> , (L-R) Luis Paredes (<a href="/myNBCC/">New Brunswick Community College</a>), Alyssa Wilcox (<a href="/UNBFCS/">UNB FCS</a>), and Sharon MacLean (<a href="/UNBEngineering/">UNB Engineering</a>). They are pictured here in front of a 2-Stage Light Gas Gun, which can shoot up to 8 km/s. Welcome to the team!
Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Test didn't go as planned? Try simulating first! Design and testing time can be costly, getting out in front of uncertainty by having a solid plan and likely outcome can save lots of time, resources and energy - and maybe a few colourful words. bit.ly/32sKYsc

Test didn't go as planned? Try simulating first! Design and testing time can be costly, getting out in front of uncertainty by having a solid plan and likely outcome can save lots of time, resources and energy - and maybe a few colourful words. bit.ly/32sKYsc
Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Excited to be at DEFSEC Atlantic this week in Halifax, connecting with aerospace and defence colleagues. Come find out CEO Shaun Kennedy if you want to chat! #DEFSECATL

Excited to be at <a href="/DEFSECAtlantic/">DEFSEC Atlantic</a> this week in Halifax, connecting with aerospace and defence colleagues. Come find out CEO Shaun Kennedy if you want to chat! #DEFSECATL
City of Fredericton (@cityfredgov) 's Twitter Profile Photo

This is neat. Check out this drone footage to see the progress on the Bill Thorpe Walking Bridge refurbishment: youtu.be/MEFR1FH96bA

Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Ever wonder what an Angry Bird looks like flying into concrete at 700km/h (435mph)? Yeah, so have we. #engineering #highspeed #impacttesting #ballistictesting bit.ly/36IXxlb

Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Check out our ability to make highly detailed and accurate measurements on complex shapes - you can see strains and displacements across the foot. The potential for this tech to be implemented in the fields of biomechanics & human performance is enormous. bit.ly/33GMmXz

Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Happy to have welcomed NB Premier @BlaineHiggs to Mach85 yesterday. We spent some time demonstrating our new infrastructure inspection technology that has the ability to save companies both time and money, while getting more data than ever before. Thanks for stopping by!

Happy to have welcomed NB Premier @BlaineHiggs to Mach85 yesterday. We spent some time demonstrating our new infrastructure inspection technology that has the ability to save companies both time and money, while getting more data than ever before. Thanks for stopping by!
Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Heureux d’accueillir le premier ministre, @BlaineHiggs, chez Mach85. Nous lui montrons notre nouvelle technologie d’inspection de l’infrastructure qui peut faire économiser temps et argent aux entreprises, tout en obtenant plus de données que jamais auparavant.

Heureux d’accueillir le premier ministre, @BlaineHiggs, chez Mach85. Nous lui montrons notre nouvelle technologie d’inspection de l’infrastructure qui peut faire économiser temps et argent aux entreprises, tout en obtenant plus de données que jamais auparavant.
Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Congrats to SpaceX, NASA, Liam and Col. Doug Hurley! We have the ability to help mitigate micro-meteoroids and orbital debris threats during these missions through our expertise in hypervelocity impact simulations and testing. Reach out to us at [email protected] for more!

Congrats to <a href="/SpaceX/">SpaceX</a>, <a href="/NASA/">NASA</a>, <a href="/AstroBehnken/">Liam</a> and <a href="/Astro_Doug/">Col. Doug Hurley</a>! We have the ability to help mitigate micro-meteoroids and orbital debris threats during these missions through our expertise in hypervelocity impact simulations and testing. Reach out to us at info@mach85.com for more!
Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

We know you haven't heard much from us lately, but we promise it's because we've been working on something really exciting! Mach85 has developed proprietary technology and techniques that are revolutionizing the infrastructure sector. Check it out! bit.ly/2XtipKk

Mach85 Inc. (@mach85inc) 's Twitter Profile Photo

Thanks, @TheFutureEcoFlo, for the support of entrepreneurs in Canada. Engineering firm over here, specializing in structural health monitoring (bridges, etc.), aerospace and ballistics.

CDR (@cdrmagazine) 's Twitter Profile Photo

ATLANTIC CANADA’S #Aerospace & #Defence Industry - Military personnel are focusing on staying “fit to fight” as governments ease #COVID19 lockdown measures and aerospace and defence companies begin to ramp-up #CDRRegionalReport #NLProud #AtlanticCanada canadiandefencereview.com/featured_conte…

ATLANTIC CANADA’S #Aerospace &amp; #Defence Industry - Military personnel are focusing on staying “fit to fight” as governments ease #COVID19 lockdown measures and aerospace and defence companies begin to ramp-up
#CDRRegionalReport #NLProud #AtlanticCanada
canadiandefencereview.com/featured_conte…