fDUB🐼⛓ b/era (@fwcrypto_) 's Twitter Profile
fDUB🐼⛓ b/era

@fwcrypto_

Community @berachain ⚛️ / Co-Host @the_honeycast 🎙️ / Contributor @0xhoneyjar 🍯 / Community @0xoogabooga 🐼

ID: 1361763601208528897

calendar_today16-02-2021 19:45:24

7,7K Tweet

5,5K Takipçi

2,2K Takip Edilen

Pukerainbow 🤮🌈 (@pukerrainbrow) 's Twitter Profile Photo

Hirys, its Thursday, time for another Irys (✧ᴗ✧) spaces! Join me, as we have a chat with the honey jar 🐼⛓️‍🧲 on what they are building & the integration into Irys ecosystem 🗓️17th July ⏲️9:00am EST / 9:00pm HKT ✅ Set reminder 👇

Hirys, its Thursday, time for another <a href="/irys_xyz/">Irys (✧ᴗ✧)</a> spaces! 

Join me, as we have a chat with <a href="/0xhoneyjar/">the honey jar 🐼⛓️‍🧲</a> on what they are building &amp; the integration into Irys ecosystem 

🗓️17th July
⏲️9:00am EST / 9:00pm HKT
✅ Set reminder 👇
Fent 🐼⛓️ (@0xfent) 's Twitter Profile Photo

Why is no one talking about this.... the honey jar 🐼⛓️‍🧲 is literally dropping a berachain manga on the TL and i haven't seen 1 single discussion. Did you know these insanely detailed drawings tell a legendary story about the Bong Bears and Berachain's History? Let's Unpack this 🧵👇

Why is no one talking about this....

<a href="/0xhoneyjar/">the honey jar 🐼⛓️‍🧲</a> is literally dropping a berachain manga on the TL and i haven't seen 1 single discussion.

Did you know these insanely detailed drawings tell a legendary story about the Bong Bears and Berachain's History?

Let's Unpack this
🧵👇
fDUB🐼⛓ b/era (@fwcrypto_) 's Twitter Profile Photo

when your productive offering is strong enough, it’s your prerogative to reach more users and provide a better alternative while staying true to your roots. that’s exactly what we’re doing. the Hyperliquid frontend is about to go live. Fast. Direct. Built for traders who

Fent 🐼⛓️ (@0xfent) 's Twitter Profile Photo

HOLY BUCKETS!!! The new Ooga Booga landing page is SEXY!!!! Love this! It shows the Berachain deployment as well as the brand new Hyper-EVM deployment!!! Definitely worth watching this animation a few times 👉 oogabooga.io

HOLY BUCKETS!!!

The new <a href="/0xoogabooga/">Ooga Booga</a> landing page is SEXY!!!! Love this! It shows the Berachain deployment as well as the brand new Hyper-EVM deployment!!! 

Definitely worth watching this animation a few times  
👉 oogabooga.io
kevin (ooga, booga) (@whoiskevin) 's Twitter Profile Photo

Ooga Booga is expanding to HyperEVM. Some have asked why we chose to keep the name rather than rebrand into something “more multi-chain.” For us, identity is not tied to where you start, but to what you stand for. Ooga Booga has become larger than its origins. Trader Joe’s

Ooga Booga Foundation (@0xoogabooga) 's Twitter Profile Photo

Ooga Booga is launching a four-week bribe program on the Hub to strengthen $OOGA liquidity. Objective: Reach $1M in LP depth and maintain a position within the Top 5 bribe pools. Bribe Size: 6.9K BERA per week allocated to the pool. APR Target: ~100% at the desired TVL levels.

Ooga Booga is launching a four-week bribe program on the Hub to strengthen $OOGA liquidity.

Objective: Reach $1M in LP depth and maintain a position within the Top 5 bribe pools.

Bribe Size: 6.9K BERA per week allocated to the pool.

APR Target: ~100% at the desired TVL levels.
Doctor Preballin (@doctorpreballin) 's Twitter Profile Photo

IT'S SCAM CITY! AND KANYE WEST DOESN'T CARE ABOUT CRYPTO. FUCK $YZY Crypto has become OVERRIDDEN with insider trading, rug pulls, and MAX EXTRACTION. It's time for a MAX INJECTION. So me and Ray J figured we'd drop the hottest diss-track of 2025

Jumper (@jumperexchange) 's Twitter Profile Photo

The Hyperliquid-based Meta DEX aggregator, Ooga Booga, is live on Jumper! 🐻 You now get better liquidity on HyperEVM with Jumperliquid. Say Ooga Booga and Make. The. Jump 💜