Nilay Buddhadev (@nilayb7) 's Twitter Profile
Nilay Buddhadev

@nilayb7

ID: 334003229

calendar_today12-07-2011 12:38:06

9,9K Tweet

62 Followers

1,1K Following

Hiren (@bhiren) 's Twitter Profile Photo

Vadhavan, Indiaโ€™s Biggest Port: One step forward two backwards. VPPL invites bids construction of offshore breakwater for the new port. Contracts Awarded: Dredging & PMC However, contracts for the main port delayed due to SC order to reexamine EIA.

Vadhavan, Indiaโ€™s Biggest Port: One step forward two backwards.

VPPL invites bids construction of offshore breakwater for the new port.

Contracts Awarded: Dredging & PMC

However, contracts for the main port delayed due to SC order to reexamine EIA.
๐Ÿ‡ฎ๐Ÿ‡ณ Amฮฑr (@amarrrrz) 's Twitter Profile Photo

Maharashtra government has approved a project to add 3rd & 4th railway lines between Pune and Lonavla with equal funding from the Centre and state. The move aims to reduce congestion, improve train frequency and cut delays caused by goods trains on this busy corridor.

Maharashtra government has approved a project to add 3rd & 4th railway lines between Pune and Lonavla with equal funding from the Centre and state.

The move aims to reduce congestion, improve train frequency and cut delays caused by goods trains on this busy corridor.
Indian Infra Report (@indianinfoguide) 's Twitter Profile Photo

๐ŸšจIndia's First Bullet Train prototype production likely to begin by september 2025. 280 kmph trainset will be indigenously built by BEML & tested on the Mumbai-Ahmedabad corridor

๐ŸšจIndia's First Bullet Train prototype production likely to begin by september 2025.

280 kmph trainset will be indigenously built by BEML & tested on the Mumbai-Ahmedabad corridor
Infra News India (INI) (@theiniofficial) 's Twitter Profile Photo

๐€๐ฎ๐ ๐ฎ๐ฌ๐ญ ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“ ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐จ๐Ÿ ๐ฎ๐ฉ๐œ๐จ๐ฆ๐ข๐ง๐  ๐ ๐ซ๐ž๐ž๐ง๐Ÿ๐ข๐ž๐ฅ๐ ๐š๐œ๐œ๐ž๐ฌ๐ฌ-๐œ๐จ๐ง๐ญ๐ซ๐จ๐ฅ๐ฅ๐ž๐ ๐ž๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ๐ฌ ๐ข๐ง ๐‰๐ก๐š๐ซ๐ค๐ก๐š๐ง๐: Check the 2nd image for the list. #Jharkhand #Expressway #Highway #Infrastructure Hemant Soren

๐€๐ฎ๐ ๐ฎ๐ฌ๐ญ ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“ ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐จ๐Ÿ ๐ฎ๐ฉ๐œ๐จ๐ฆ๐ข๐ง๐  ๐ ๐ซ๐ž๐ž๐ง๐Ÿ๐ข๐ž๐ฅ๐ ๐š๐œ๐œ๐ž๐ฌ๐ฌ-๐œ๐จ๐ง๐ญ๐ซ๐จ๐ฅ๐ฅ๐ž๐ ๐ž๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ๐ฌ ๐ข๐ง ๐‰๐ก๐š๐ซ๐ค๐ก๐š๐ง๐:

Check the 2nd image for the list.

#Jharkhand #Expressway #Highway #Infrastructure <a href="/HemantSorenJMM/">Hemant Soren</a>
Infra News India (INI) (@theiniofficial) 's Twitter Profile Photo

๐๐ก๐จ๐ฉ๐š๐ฅ-๐‰๐š๐›๐š๐ฅ๐ฉ๐ฎ๐ซ ๐„๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐Ÿ๐ซ๐จ๐ฆ ๐Œ๐š๐๐ก๐ฒ๐š ๐๐ซ๐š๐๐ž๐ฌ๐ก. Minister of Road Transport & Highways, Mr. Nitin Gadkari, has announced a new 4 lane greenfield expressway between Bhopal and Jabalpur. This greenfield expressway would be 255

๐๐ก๐จ๐ฉ๐š๐ฅ-๐‰๐š๐›๐š๐ฅ๐ฉ๐ฎ๐ซ ๐„๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐Ÿ๐ซ๐จ๐ฆ ๐Œ๐š๐๐ก๐ฒ๐š ๐๐ซ๐š๐๐ž๐ฌ๐ก.

Minister of Road Transport &amp; Highways, Mr. Nitin Gadkari, has announced a new 4 lane greenfield expressway between Bhopal and Jabalpur.

This greenfield expressway would be 255
NHSRCL (@nhsrcl) 's Twitter Profile Photo

The Mumbai-Ahmedabad Bullet Train Project is not just transforming skylines but also enhancing ease of travel. Running alongside the Western Railway corridor, the elevated viaduct through Ahmedabad symbolizes seamless connectivity and a future of faster, smoother journeys.

The Mumbai-Ahmedabad Bullet Train Project is not just transforming skylines but also enhancing ease of travel. Running alongside the Western Railway corridor, the elevated viaduct through Ahmedabad symbolizes seamless connectivity and a future of faster, smoother journeys.
Indian Infra (@indiainfra02) 's Twitter Profile Photo

Delhi-Meerut RRTS Corridor: The interior work of Modipuram RRTS station, the project's final station, is complete; it will also serve as a RRTS metro station.

Delhi-Meerut RRTS Corridor: The interior work of Modipuram RRTS station, the project's final station, is complete; it will also serve as a RRTS metro station.
Infra News India (INI) (@theiniofficial) 's Twitter Profile Photo

๐€๐ฎ๐ ๐ฎ๐ฌ๐ญ ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“ ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐จ๐Ÿ ๐ฎ๐ฉ๐œ๐จ๐ฆ๐ข๐ง๐  ๐ ๐ซ๐ž๐ž๐ง๐Ÿ๐ข๐ž๐ฅ๐ ๐š๐œ๐œ๐ž๐ฌ๐ฌ-๐œ๐จ๐ง๐ญ๐ซ๐จ๐ฅ๐ฅ๐ž๐ ๐ž๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ๐ฌ ๐ข๐ง ๐–๐ž๐ฌ๐ญ ๐๐ž๐ง๐ ๐š๐ฅ: Check the 2nd image for the list. #WestBengal #Expressway #Highway #Infrastructure #NitinGadkari

๐€๐ฎ๐ ๐ฎ๐ฌ๐ญ ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“ ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐จ๐Ÿ ๐ฎ๐ฉ๐œ๐จ๐ฆ๐ข๐ง๐  ๐ ๐ซ๐ž๐ž๐ง๐Ÿ๐ข๐ž๐ฅ๐ ๐š๐œ๐œ๐ž๐ฌ๐ฌ-๐œ๐จ๐ง๐ญ๐ซ๐จ๐ฅ๐ฅ๐ž๐ ๐ž๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ๐ฌ ๐ข๐ง ๐–๐ž๐ฌ๐ญ ๐๐ž๐ง๐ ๐š๐ฅ:

Check the 2nd image for the list.

#WestBengal #Expressway #Highway #Infrastructure #NitinGadkari
Infra News India (INI) (@theiniofficial) 's Twitter Profile Photo

๐ƒ๐ž๐ฅ๐ก๐ข-๐Œ๐ฎ๐ฆ๐›๐š๐ข ๐„๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ ๐•๐š๐๐จ๐๐š๐ซ๐š-๐•๐ข๐ซ๐š๐ซ ๐’๐ž๐œ๐ญ๐ข๐จ๐ง ๐๐š๐œ๐ค๐š๐ ๐ž ๐Ÿ• ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐Ÿ๐ซ๐จ๐ฆ ๐†๐ฎ๐ฃ๐š๐ซ๐š๐ญ. IRB Infra has received provisional completion certificate for 27.5 Km package 7 of Delhi-Mumbai Expressway from Ena interchange to

๐ƒ๐ž๐ฅ๐ก๐ข-๐Œ๐ฎ๐ฆ๐›๐š๐ข ๐„๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ ๐•๐š๐๐จ๐๐š๐ซ๐š-๐•๐ข๐ซ๐š๐ซ ๐’๐ž๐œ๐ญ๐ข๐จ๐ง ๐๐š๐œ๐ค๐š๐ ๐ž ๐Ÿ• ๐ฎ๐ฉ๐๐š๐ญ๐ž ๐Ÿ๐ซ๐จ๐ฆ ๐†๐ฎ๐ฃ๐š๐ซ๐š๐ญ.

IRB Infra has received provisional completion certificate for 27.5 Km package 7 of Delhi-Mumbai Expressway from Ena interchange to
Alstom India (@alstomindia) 's Twitter Profile Photo

Weโ€™re proud to partner with Larsen & Toubro for Mumbai Metro Line 4. Alstom will deliver 234 Metropolis cars, CBTC signalling & 5 yrs of maintenance, designed & made across our sites in Bengaluru, Sri City, Coimbatore & Savli. Read More: ow.ly/HE0i50WLRgg #MakeInIndia

๐Ÿ‡ฎ๐Ÿ‡ณ Amฮฑr (@amarrrrz) 's Twitter Profile Photo

East Coast Railway has floated bids worth โ‚น383.36 crore for 6 tunnels under the Koraput-Singapur Road Doubling Project in Andhra Pradesh. The EPC contract includes tunnels between Tikiri and Rauli stations, with a 30 month completion timeline. The bid deadline is 31 Oct 2025.

East Coast Railway has floated bids worth โ‚น383.36 crore for 6 tunnels under the Koraput-Singapur Road Doubling Project in Andhra Pradesh.

The EPC contract includes tunnels between Tikiri and Rauli stations, with a 30 month completion timeline. The bid deadline is 31 Oct 2025.
InfraStory (@marinebharat) 's Twitter Profile Photo

Alstom - L&T to supply 39 trainsets of 6 coaches (234 cars), CBTC Signalling and Platform Screen Doors to Mumbai Metro Line 4 (Gaimukh - Wadala) These trains will be manufactured over next 2 years in Sri City plant in the state of Andhra Pradesh Pic Source - Alstom

Alstom - L&amp;T to supply 39 trainsets of 6 coaches (234 cars), CBTC Signalling and Platform Screen Doors to Mumbai Metro Line 4 (Gaimukh - Wadala)

These trains will be manufactured over next 2 years in Sri City plant in the state of Andhra Pradesh

Pic Source - Alstom
Central Railway (@central_railway) 's Twitter Profile Photo

Boosting connectivity in Maharashtra! CSMTโ€“Jalna #VandeBharatExpress now extended to Hazur Sahib Nanded, covering 610 km in just 9ยฝ hours.

Boosting connectivity in Maharashtra!

CSMTโ€“Jalna #VandeBharatExpress now extended to Hazur Sahib Nanded, covering 610 km in just 9ยฝ hours.
The Rail Tempest (@harsh22301er) 's Twitter Profile Photo

Bairabi-Sairang(Aizawl) line was inspected by Chairman/RB on 24/08. Mizoram CM Lalduhoma has announced that the line will be inaugurated by Hon'ble PM Modi on 13th September. No update on which train will be started. Probably a Rajdhani/Train to Guwahati PC - news outlets

Bairabi-Sairang(Aizawl) line was inspected by Chairman/RB on 24/08. 

Mizoram CM Lalduhoma has announced that the line will be inaugurated by Hon'ble PM Modi on 13th September.

No update on which train will be started. Probably a Rajdhani/Train to Guwahati

PC - news outlets
Rajendra B. Aklekar (@rajtoday) 's Twitter Profile Photo

Driverless with bicycle racks, here's the first look and features of Mumbai Metro Green Line train design. Alstom India mid-day.com/mumbai/mumbai-โ€ฆ