GTAWestStudy (@gtaweststudy) 's Twitter Profile
GTAWestStudy

@gtaweststudy

Contact us by phone at 1-877-522-6916 or by email at [email protected]

ID: 1131945211725324288

linkhttp://www.gta-west.com/ calendar_today24-05-2019 15:29:03

30 Tweet

57 Followers

48 Following

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Even with optimizing the existing transportation network, widening existing highways & the Metrolinx transit expansion projects, additional road capacity is needed to support future people & goods movement, the economy & projected growth #GTAWestStudy

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Completion of the #GTAWest Transportation Corridor Route Planning and Environmental Assessment Study will define the property envelope for the multimodal transportation corridor and provide greater certainty to stakeholders.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Municipalities and other stakeholders may be conducting studies within the #GTAWest Study Area but the identification of the Preferred Route is the responsibility of the MTO. Look for our logo to be sure you are getting the most up-to-date information about the #GTAWestStudy.

Municipalities and other stakeholders may be conducting studies within the #GTAWest Study Area but the identification of the Preferred Route is the responsibility of the MTO. Look for our logo to be sure you are getting the most up-to-date information about the #GTAWestStudy.
GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

We understand that all #GTAWest routes will have impacts and are following a rigorous process to find the best solution. The #GTAWest Project Team will present a Technically Preferred Route at Public Information Centre 2 in Fall 2019.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

The #GTAWest Project Team continues to review and incorporate feedback where possible from stakeholders as each stage of the study progresses.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

We will continue to refine the Focused Analysis Area (FAA) at key study stages to inform stakeholders about which properties continue to be within an area of interest. A reduced FAA will be presented at Public Information Centre 2.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

#GTAWest Public Information Centre 2 is scheduled for September 19, September 26, and October 3, 2019. Visit gta-west.com for more information.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

The first #GTAWestStudy Public Information Centre 2 is next week. Sessions are drop-in style and run from 4 pm – 8 pm. For more info visit gta-west.com.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

#GTAWestStudy Public Information Centre #2 is today at Chateau Le Jardin from 4-8 p.m. Visit gta-west.com for details and come give us your feedback on the Technically Preferred Route for the multimodal transportation corridor.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Getting lots of feedback on the Technically Preferred Route at Public Information Centre #2 for the #GTAWestStudy at Chateau Le Jardin.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

We’re at the Gellert Community Centre today from 4-8 p.m. for #GTAWestStudy Public Information Centre 2. Visit gta-west.com for more information. Come and tell us what you think about the Technically Preferred Route for the new multimodal transportation corridor.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Final round of #GTAWestStudy Public Information Centre 2 is today at the Brampton Fairgrounds from 4-8 pm. Visit gta-west.com for more information. We want your thoughts on the Technically Preferred Route for the multimodal transportation corridor.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

#GTAWest Public Information Centre 2 displays are available at gta-west.com. Comments on the material, including the evaluation of the short listed route alternatives, the Technically Preferred Route and 2019 Focused Analysis Area will be accepted until Oct 31, 2019.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Do you want to inspire the design of the #GTAWestStudy corridor? Apply by October 31, 2019 to participate in the Community Value Plan process, which will result in design recommendations that enhance the corridor’s treatment of landscape and community valued cultural elements.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

Approx. 1000 people participated in Public Information Centre 2 for the #GTAWestStudy in September/October 2019 and provided valuable feedback. Thank you for contributing.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

The Project Team will be seeking permission to enter properties in areas potentially impacted by the #GTAWest Technically Preferred Route for field investigations to better understand local conditions and property-specific issues in support of preliminary design of the corridor.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

We are incorporating feedback where possible from #GTAWestStudy Public Information Centre #2, and are working to confirm the Preferred Route and Focused Analysis Area.

GTAWestStudy (@gtaweststudy) 's Twitter Profile Photo

The Project Team has confirmed the Preferred Route and 2020 Focused Analysis Area (FAA) based on feedback from Public Information Centre 2 and other relevant data. Visit gta-west.com to review the Preferred Route and 2020 FAA #GTAWestStudy

The Project Team has confirmed the Preferred Route and 2020 Focused Analysis Area (FAA) based on feedback from Public Information Centre 2 and other relevant data. Visit gta-west.com to review the Preferred Route and 2020 FAA #GTAWestStudy