Chase Dowling (@cpatdowling) 's Twitter Profile
Chase Dowling

@cpatdowling

Building @basepowerco | Energy + AI Previously @Tesla, @PNNLab

ID: 1570451444880519168

linkhttps://cpatdowling.github.io/ calendar_today15-09-2022 16:36:46

1,1K Tweet

649 Followers

407 Following

Fred Stafford (@fredstaffordcs) 's Twitter Profile Photo

Note that Fermi's four AP1000s recently submitted for review, for a massive energy facility outside Amarillo, TX, is both outside the ERCOT territory and planned for behind-the-meter operation.

Chase Dowling (@cpatdowling) 's Twitter Profile Photo

ur an ml engineer tuning matrices of 8bit ints for b2b saas, but you could be redesigning the largest machine on the planet instead

ur an ml engineer tuning matrices of 8bit ints for b2b saas, but you could be redesigning the largest machine on the planet instead
Chase Dowling (@cpatdowling) 's Twitter Profile Photo

If knowledge is free, human agency is the premium. Not going to SF because it has gravity is super high agency. Highest future talent density will be found in Portland, Maine.

Chase Dowling (@cpatdowling) 's Twitter Profile Photo

Spotted today way out in the Austin burbs: branded Model Y Robotaxi. Cybertruck with their rooftop computer vision rig doing ground truth data collection. Robotaxi at my doorstep yeeeees.

Justin Lopas (@jlopas) 's Twitter Profile Photo

New Geographies 🌎 Expansion outside of Texas is one of the key initiatives Base Power . We're hiring for an n of 1, first of a kind role that leads the operational effort of doing so. If you're a self starter 0 to 1 type that likes to wear a ton of hats and build an

New Geographies 🌎

Expansion outside of Texas is one of the key initiatives <a href="/basepowerco/">Base Power</a> . We're hiring for an n of 1, first of a kind role that leads the operational effort of doing so.

If you're a self starter 0 to 1 type that likes to wear a ton of hats and build an
Chase Dowling (@cpatdowling) 's Twitter Profile Photo

Average existing data center utilization at the meter straight from ERCOT. Looks awful high to me. Missing x-axis is single 24 hour day. y-axis is scaled MW. >85% load factor on average.

Average existing data center utilization at the meter straight from ERCOT. Looks awful high to me. 

Missing x-axis is single 24 hour day. y-axis is scaled MW. &gt;85% load factor on average.
Chase Dowling (@cpatdowling) 's Twitter Profile Photo

Herein lies the sea change. Operationally power markets have largely revolved around a smooth offer curve and nearly inelastic load bid curve. Communications and control were designed efficiently around it. A variety of load resources will just stretch out the bid curve. A

Arena Magazine (@arenamagdotcom) 's Twitter Profile Photo

American Power is American Power ⚡️ The grid is aging. Energy demand is accelerating thanks to AI. The pressures on the system are immense, and power is becoming more important than ever. Enter @BasePowerCo with a very *American* mission: more power, for less.

American Power is American Power ⚡️

The grid is aging. Energy demand is accelerating thanks to AI. The pressures on the system are immense, and power is becoming more important than ever.

Enter @BasePowerCo with a very *American* mission: more power, for less.