Amey Deshmukh (@amey_deshmukh) 's Twitter Profile
Amey Deshmukh

@amey_deshmukh

Trust me.. I'm an Engineer!

Husband, Railfan, Infra Consultant

ID: 141659537

calendar_today08-05-2010 17:27:41

1,1K Tweet

138 Followers

505 Following

Amey Deshmukh (@amey_deshmukh) 's Twitter Profile Photo

Not just the Nation's Financial Security, but the opposition wants to destroy our food security too! Does anyone at Congress even bother to vet these nonsensical promises? Does anyone even realize the implications of such stupid and loose comments by leaders such as Mallikarjun Kharge?

Not just the Nation's Financial Security, but the opposition wants to destroy our food security too!

Does anyone at <a href="/INCIndia/">Congress</a> even bother to vet these nonsensical promises?

Does anyone even realize the implications of such stupid and loose comments by leaders such as <a href="/kharge/">Mallikarjun Kharge</a>?
Amey Deshmukh (@amey_deshmukh) 's Twitter Profile Photo

I.N.D.I.Alliance: These Exit Polls are fantasy polls and have been carried out under pressure, without any scientific approach. Our exit polls reveal that we win 295 seats. Media: What is the basis of this number? I.N.D.I.Alliance: Sidhu Moosewala song suna hai?.. 295.. So 295!

Amey Deshmukh (@amey_deshmukh) 's Twitter Profile Photo

A modification in signage on Indian Railways which is a step in the right direction. Speed Limit warning sign boards now indicate the upcoming speed limit, which helps Loco Pilots and Motormen to reduce speed accordingly! The earlier boards had holes / black dots on both sides!

A modification in signage on Indian Railways which is a step in the right direction.

Speed Limit warning sign boards now indicate the upcoming speed limit, which helps Loco Pilots and Motormen to reduce speed accordingly!

The earlier boards had holes / black dots on both sides!
Amey Deshmukh (@amey_deshmukh) 's Twitter Profile Photo

How about you take up the cost increase of Mumbai Metro Line 3 (your favourite project) by Rs. 10,000 Cr. and try to expose the con, now that you are concerned by a project cost of 650Cr. But do mention the true reasons why the cost increased! Do make it your priority though!