Veer (@veer976) 's Twitter Profile
Veer

@veer976

Diehard #Flames fan, not by choice, but it is a lifestyle #PutSnowInTheRaftersšŸ”„ / Craig Conroy.. you’re a beautiful man. RIP - Johnny Gaudreau šŸ•Šļø

ID: 1681013253399531520

calendar_today17-07-2023 18:49:34

11,11K Tweet

403 Followers

359 Following

Veer (@veer976) 's Twitter Profile Photo

Would be amazing if the #Flames can shut down Backlund and co. For the rest of the season. Zero playoff hopes, time to give the veterans an early off-season. Oh yeah don’t forget Cooley, this team doesn’t need heroics right now

Matchsticks & Gasoline (@matchstickscgy) 's Twitter Profile Photo

How is the Andersson trade anything but a home run for the #Flames - Sold high on a player given the circumstances - Got a quality NHL RHD - A now-signed prospect to add organizational depth with some NHL upside - A future 1st from a franchise that’s aging - A 2nd Craig cooked.

Penguins PR (@penguinspr) 's Twitter Profile Photo

The following players will not play today and their statuses are considered day to day: - Sidney Crosby (lower-body) - Ben Kindel (upper-body) - Evgeni Malkin (upper-body) - Bryan Rust (lower-body) - Parker Wotherspoon (upper-body) - Erik Karlsson (lower-body) - Kris Letang

Veer (@veer976) 's Twitter Profile Photo

#Flames are 11-4-2 against the Kraken since their inception, and 8 of those games were on the road, where Calgary holds a 7-0-1 record, they just dont lose in Seattle. Feels like a scheduled win but who knows, hearing Abram Wiebe makes his debut tonight as well.

Veer (@veer976) 's Twitter Profile Photo

The #Flames really botched up a higher draft selection by not trading Blake Coleman. they did almost enough to secure a bottom 2 spot but as expected they will likely pick no higher than 4th overall… ah, great time to be a fan.

Veer (@veer976) 's Twitter Profile Photo

ā€œFarabee slapping his stick on the ice out of frustrationā€ šŸ˜‚šŸ˜‚šŸ˜‚ bro get these heroes out of here #Flames

Jon Engstrom (@jonnengstrom) 's Twitter Profile Photo

One thing you just can’t teach is confidence, and #Gridin is full of it. I can very well see him lead the team in scoring, considering he had 14 points in his final 20 games of the season, on a team that struggled—aside from his new line—to produce consistent offence. That

One thing you just can’t teach is confidence, and #Gridin is full of it. I can very well see him lead the team in scoring, considering he had 14 points in his final 20 games of the season, on a team that struggled—aside from his new line—to produce consistent offence. 

That
Veer (@veer976) 's Twitter Profile Photo

Of the #NHL teams that are down 3-0 right now in the first round of the Stanley Cup Playoffs, which of them do you think has the best chance to come back?

Married My Porch Pirate (@herbderby) 's Twitter Profile Photo

this is why "team tank" has become so vocal. we want them to escape this spiral. The flames and their media don't get it. Huska was on fan 960 saying "players dont care about a top draft pick" ok well maybe they should, this franchise will keep being irrelevant without one

Veer (@veer976) 's Twitter Profile Photo

Really happy for Dan Vladars masterclass performance with a shutout victory to close the series against Crosby and the Penguins. I just can’t help but wonder how the #Flames organization feels seeing this… either way, dans the man

Veer (@veer976) 's Twitter Profile Photo

#letsgooilers might get eliminated in the 1st round to the young and full of cum Anaheim ducks. The #Flames fan in me would be so giddy

#letsgooilers might get eliminated in the 1st round to the young and full of cum Anaheim ducks. 

The #Flames fan in me would be so giddy
Veer (@veer976) 's Twitter Profile Photo

Connor McDavid went through the handshake line so fast you can barely catch him on the broadcast hahahahaha. Oilers are finished.

Veer (@veer976) 's Twitter Profile Photo

I’ve never wanted anything more than for the #Flames to win the draft lottery today. I hope the luck is in our favour, would be franchise altering and cut the rebuild timeline

I’ve never wanted anything more than for the #Flames to win the draft lottery today. I hope the luck is in our favour, would be franchise altering and cut the rebuild timeline