Huge !! 6 new Expressways for Gujarat 🔹 Total length : 1100 km 🔹 Total Cost : 96,000 cr 1. Rajkot - Dwarka : 209 km 2. Rajkot - Porbandar : 190 km 3. Rajkot - Ahmedabad : 170 km 4. Jetpur - Somnath : 110 km 5. Deesa - Surendranagar : 220 km 6. Surendranagar - Pipavav : 211

Huge !!

6 new Expressways for Gujarat

🔹 Total length : 1100 km
🔹 Total Cost : 96,000 cr

1. Rajkot - Dwarka : 209 km
2. Rajkot - Porbandar : 190 km
3. Rajkot - Ahmedabad : 170 km
4. Jetpur - Somnath : 110 km
5. Deesa - Surendranagar : 220 km
6. Surendranagar - Pipavav : 211
The Index of Gujarat (@indexofgujarat) 's Twitter Profile Photo

BN Holdings to set up Oleo-Chemical plant in Gujarat 📍 Location : Kandla Port 🔹 Investment : 1,200 cr 🔹 Jobs : 2000 It will be the largest oleo-chemical manufacturing unit in India

BN Holdings to set up Oleo-Chemical plant in Gujarat

📍 Location : Kandla Port
🔹 Investment : 1,200 cr
🔹 Jobs : 2000

It will be the largest oleo-chemical manufacturing unit in India
The Index of Gujarat (@indexofgujarat) 's Twitter Profile Photo

The investment and growth news from Tamil Nadu are mind blowing 🫡 Almost 0 major investments announced this year in Gujarat Looks like Gujarat has gone into sleep mode 😔

The Index of Gujarat (@indexofgujarat) 's Twitter Profile Photo

Gujarat's Expressway network by 2030 1. Delhi - Mumbai Eway → (almost completed) 2. Ahmedabad - Vadodara Eway → (Operational) 3. Ahmedabad - Dholera Eway → (almost completed) 4. Ahmedabad - Tharad Eway → (work started) 5. Ahmedabad - Rajkot Eway → (DPR stage) 6.

Gujarat's Expressway network by 2030

1. Delhi - Mumbai Eway → (almost completed)
2. Ahmedabad - Vadodara Eway → (Operational)
3. Ahmedabad - Dholera Eway → (almost completed)
4. Ahmedabad - Tharad Eway → (work started)
5. Ahmedabad - Rajkot Eway → (DPR stage)
6.
The Index of Gujarat (@indexofgujarat) 's Twitter Profile Photo

Kaynes Semiconductor Plant in Gujarat to become operational by December 📍 Location : Sanand, Ahmedabad 🔹 Capacity : 6.3 million chips/day → The clean room is ready → Equipment and raw materials are currently being brought in → First sample by September 15

Kaynes Semiconductor Plant in Gujarat to become operational by December

📍 Location : Sanand, Ahmedabad
🔹 Capacity : 6.3 million chips/day

→ The clean room is ready
→ Equipment and raw materials are currently being brought in
→ First sample by September 15
The Index of Gujarat (@indexofgujarat) 's Twitter Profile Photo

Upcoming Riverside Savouries at Sabarmati Riverfront 📍 Between Vivekanand bridge & Nehru bridge 🔹 Area : 7 acres 🔹 Signature restaurants with luxury indoor and outdoor dining areas Existing riverfront road to be converted into tunnel passing under this structure.

Upcoming Riverside Savouries at Sabarmati Riverfront

📍 Between Vivekanand bridge & Nehru bridge
🔹 Area : 7 acres
🔹 Signature restaurants with luxury indoor and outdoor dining areas

Existing riverfront road to be converted into tunnel passing under this structure.
The Index of Gujarat (@indexofgujarat) 's Twitter Profile Photo

GIFT City 🔹National Mineral Development Corporation to open a subsidiary at GIFT City 🔹Central Bank of India to open unit at GIFT City

GIFT City

🔹National Mineral Development Corporation to open a subsidiary at GIFT City

🔹Central Bank of India to open unit at GIFT City