Bernardo RM
@bernardorm5
🖖🏄
Building crypto events🍄🤯
ID: 1288777201010311168
30-07-2020 10:03:33
910 Tweet
407 Followers
1,1K Following
After reading Doug Colkitt's post I got excited by the Eth 3.0 vision The reality delivered by Justin Drake is pretty disappointing. Basically a refactored codebase w/ 4 second blocks and "quantum resistance". All delivered by 2029-2030 This isn't enough to make Eth L1
StablecoinX Inc. StablecoinX has announced an additional $530 million capital raise as part of its $ENA accumulation strategy. To date, StablecoinX has raised a total of approximately $895M in PIPE financing, which is expected to result in a vehicle with over 3 billion ENA